United Kingdom / Dec 04, 2021 / Ealing Film Festival 2021
Thanks For Watching (2021)
Overall average
5.0/10
Plot
"Zhongsen Theatre" opened in 1968. At that time, the theaters competed with each other. The Zhongsen Theatre still managed its own characteristics in many theaters. However, after 2000, the old city was down, and it was closed to the changes of the times. The company was closed down and idle. As the old city began to recover, the theaters also changed hands, but most of them did not present the cinema, and the Zhongsen Theatre was sold to the construction company in 2016. The film records the demolition of the old theater and the rescue of two antique projectors, hoping to find a more suitable place for them to preserve and continue the spirit of the times. After the demolition is completed, the site is intended to be used as a new residential construction site.
Genres
Technical details
| Detail | Value |
|---|---|
| Original title | 謝謝收看 |
| Original language | 普通话 (ZH) |
| Spoken languages | 普通话 |
| Production countries | Taiwan |
| Status | Released |
| Release date | 4 dicembre 2021 |
| Assistant directors | Lee Chine-cheng |
Release dates
Digital
Editorial content to complete
6 sections to complete. You can show them now and start filling them in.












